Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 12, 2024

No Information to Display

To Be Determined

New Construction, Paving, Site Work

No Information to Display

$7,000,000.00

Public - City

img_map_placeholder

To Be Determined, Sanger, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of October 17, 2023, an architect has been selected, and this project is in the schematic design phase. A timeline for bidding and construction has yet to be announced. Closed solicitation has been included below for reference. Response Format Electronic Online Q&A No The City of Fresno Fire Department (City) is requesting Statement of Qualifications (SOQ) from qualified architectural/engineering firms to design and prepare full 30% schematic design documents for submittal to and approval from the City of Fresno, Planning Division for the new Fire Department Regional Training Center. The Fire Department Regional Training Center will be built on an approximate 40-acre lot adjacent to the existing City of Fresno, Police Department Training Facility. The Master Site Plan has been developed and it is the goal of the City to obtain the services of an architectural/engineering firm that has experience in designing the following types of facilities: 1. Training Administration and Classrooms building 2. Multiple Classroom buildings 3. USAR Storage building and USAR Structure 4. Commercial Training Structure 5. Mock Fire Station with Pavilion/Classroom 6. Dive Pool 7. 1-Story and 2-Story Residential Training structures 8. Haz-Mat Multi-Use Training Structure 9. Railcar Training 10. Silo Structure 11. Slow Skills Driving Pad 12. Swift Water Training SOQ's are due no later than 4:00 PM (PDT) Friday, July 2, 2021, to debra.bernard@fresno.gov. The City of Fresno reserves the right to accept or reject any SOQs. No consideration will be given to any SOQ's received after the above time and date. The method of Contractor Selection has not been Determined at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.