Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2021

April 11, 2022

May 16, 2022

1616 Airport Cir

Outdoor Lighting, Paving, Site Work

No Information to Display

$7,258,145.00

Public - City

img_map_placeholder

1616 Airport Cir, Hailey, ID

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of August 26, 2021. The project has been awarded with the amount of $7,258,144.50. SUN - Runway, Taxiway and Apron Rehabilitation Description: Rehabilitate Runway 13-31, Taxiway B, and Aprons Rehabilitate Runway 13-31 consists of a mill and inlay of Runway 13-31, constructing 20 foot wide paved shoulders and a new blast pad on the Runway 13 end. Work also includes safety area grading and stormwater improvements. Civil work includes partial depth roto-milling of the runway pavement, removal of the runway edge and end lighting and signs, full depth excavation and construction of subbase and base course as well as stormwater and underdrain improvements. Other work includes installation of new runway edge and end lighting, reinstallation of runway signs on new foundations, installation of new runway weather information system, placement of HMA pavement, application of pavement markings and grooving the runway surface. Approximate civil quantities include 85,000 SY of Rotomilling, 21,000 CY of excavation, 12,000 CY of total aggregates, 21,600 tons of hot mix asphalt pavement, 1,000 LF underdrain pipe, 220,000 SF of pavement markings, 67,000 SY of pavement grooving. Approximate electrical quantities include 5,500 LF of conduit, 28,000 LF of 5kV conductor, 13,000 LF of counterpoise, 95 LED HIRL fixtures, and 100 two piece base cans. Taxiway and Apron Pavement Maintenance consists of pavement maintenance of the parallel Taxiway B, connecting taxiways and adjacent apron areas. The work includes surface preparation, crack sealing, fog sealing and pavement markings. Approximate quantities include 16,000 LF of crack sealing, 16,000 Gal of seal coat and 53,000 SF of pavement markings. Mill and Inlay Apron Pavement consists of asphalt removal, regrading and compacting existing base course, HMA pavement placement and pavement markings. Approximate civil quantities include 24,000 SY of pavement removal, 24,000 SY of regrading and compacting existing base, 5,500 tons of hot mix asphalt pavement and 1,200 SF of pavement markings. Relocate Perimeter Fence consists of demolition of existing perimeter fencing and gate and installing new perimeter fence and gate. Quantities include 725 LF of fence demolition, 1,725 LF of new fence installation and relocation of 1 vehicle gate.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects