Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2021

September 23, 2021

October 25, 2021

155 1000 W

Paving, Site Work

No Information to Display

$1,421,888.00

Public - State/Provincial

img_map_placeholder

155 1000 W, Salt Lake City, UT

Subscribe to View Full Documents

As of August 24, 2021, this project has not yet been awarded. A timeline for award has not yet been established Final round of questions due: Thursday, June 24, 2021 Project Description: This project mostly consists of removing bad pavement and regrading to improve drainage with new asphalt. General Conditions, Erosion Control, Traffic Control / Pedestrian Safety, Construction Survey & Staking Sawcut and remove asphalt and road base down 11 inches, Over excavate soft subgrade and fill with pit-run material, Provide and install stabilization fabric, Remove and replace existing utility boxes, Provide and install new precast catch basin with concrete apron, Remove, store, and reinstall existing grate and frame into new concrete apron. Sawcut top catch basin as required for extension. Provide and install new 12" RCP storm drain line, New dry well rings w/ 25'x25' gravel, Provide and install new 3'-0" wide concrete waterway, install 6"x6" concrete mow strip, install 6" thick concrete pad beneath large tent area, install 6" thick concrete pads for additional tent areas, install 8" road base, install 3" asphalt, Flush system and clean-out debris from new and existing storm drain catch basins. Question Submission Close Date 6/21/2021 3:00 PM MDT

41 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects