Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2021

August 12, 2021

January 9, 2022

Multiple Locations

Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

Multiple Locations, Sumter, SC

Subscribe to View Full Documents

The construction of a new 240 gpm duplex submersible pump station and 40 kw emergency generator, installation of approximately 30 LF of 8" gravity sewer line ,1 manhole, approximately 4805LF of 6" PVC force main, 40 lf of 6" DIP, 525 LF of 8" HDPE directional drill,132' of 6" DIP in 12" steel casing pipe jack and bore, approximately3446 LF of 12" PVC water main, 100 LF of 12" DIP,approximately 130 LF of 12" DIP in 24" steel casing, gate valves and 3 fire hydrants. Construction Cost Range: $600000-$800000

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.