Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 1, 2021

July 27, 2021

October 19, 2021

To Be Determined

Renovation, Site Work

No Information to Display

$288,150.00

Public - County

img_map_placeholder

To Be Determined, Reno, NV

Subscribe to View Full Documents

Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required to make improvements to the Kietzke and Morrill PCE treatment plants. RANGE FOR ENGINEER'S ESTIMATE: $193,500 - $236,500 A pre-bid conference and site visit will NOT be held. ANTICIPATED START DATE: On or Before July 27, 2021 COMPLETION DEADLINE: October 19, 2021 Bid results and the bid tabulation will be posted on NGEM and bidders will be notified electronically of the results. TMWA reserves the right to reject any or all bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced, or conditional bids, and to reject the bid of any bidder if TMWA believes that it would not be in the best interest of TMWA to make an award to that bidder. TMWA also reserves the right to waive informalities. Bids will be evaluated as prescribed in Nevada Revised Statute 338.147. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. The work to be done under this Contract consists of furnishing all labor, materials (except those specifically specified to be supplied by TMWA), equipment, and incidentals required for construction of the pump to waste piping improvements and associated site and well house work. The major items of work are: 1. Modification to Kietzke Well Pump to Waste discharge piping, catch basin modifications, and installation of a duckbill check valve. 2. Removal and replacement of flexible duct connector at connection between air handler duct and Kietzke Packed Tower Aerator. 3. Modification of Morrill Sodium Hypochlorite Room to increase chlorine storage and improve injection locations. 4. Removal and replacement of existing tower drain valves and vault improvements at Morrill Well Site. 5. Site restoration including aggregate base re-surfacing.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.