Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 29, 2021

July 26, 2021

September 27, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Ogilvie, MN

100

14

4

6

Subscribe to View Full Documents

Street Reconstruction, common excavation, storm sewer, watermain construction, curb and gutter, sidewalk, bituminous pavement, and state Highway ditch reconstruction. Pre-Bid Meeting Information: None LOCATION: Hill Street, Rutherford Street, and George Street, all in Ogilvie MN LENGTH: Hill Street 1500 LF, Rutherford Street 2463 LF, George Street 1480 LF. TYPES OF WORK: Hill Street - Watermain, Grading, Aggregate Base, Sidewalk, Curb and gutter, Storm sewer, Bituminous Surfacing, Pavement Markings. Rutherford Street - Watermain, Grading, Aggregate Base, Curb and gutter, Storm sewer, Bituminous Surfacing, Pavement Markings. George Street - Milling, Bituminous Surfacing, Pavement Markings. TH 22 - Ditch cleaning and reconstruction

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.