Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 27, 2022

March 15, 2022

February 8, 2023

2400 Aviation Dr

Site Work

No Information to Display

$15,441,978.00

Public - City

img_map_placeholder

2400 Aviation Dr, Dallas, TX

Subscribe to View Full Documents

The Work of this Contract comprises of the rehabilitation and replacement of storm drain pipes on Runway 17L/35R and all associated connecting taxiways within the runway environment. Construction will be inside the Airport's Air Operations Area (AOA). The Contractor shall be responsible for reviewing all existing conditions associated with the Work prior to commencement of work activities. o Centrifugally Cast Concrete Pipe (CCCP) lining of the existing SRMP storm drain system ranging from 42" to 96" diameter pipes and several lateral drain line replacement. o Two (2) approved cementitious based liner products specified in Spec Section D-703. o Work within the Runway and Taxiway Safety Areas including the Object Free Areas shall be performed at night between 2200 hrs and 0600 hrs. The independent estimate of this work is $18,821,069.00 Minority-women business enterprise (MWBE) goal: 10% The DFW Airport, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award Contact: contract administrator, patrick karlovitz 972-973-1725 Additional information is available on the DFW International Airport portal Deadline for Questions: December 9, 2021 5:00 PM. Estimated NTP February 2022 Estimated Duration 330 Calendar Days *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.