Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 17, 2021

August 16, 2021

October 18, 2021

Cutting Blvd & Harbour Way S

Paving, Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

Cutting Blvd & Harbour Way S, Richmond, CA

Subscribe to View Full Documents

Online Q&A Yes Q&A Deadline Q&A Deadline 06/09/2021 2:00 PM (PDT) In general, the work consists of installing asphalt berm, striping, slurry seal, traffic signal; and for all other work, items, or details to improve bicycle facilities that are required by the Drawings, Standard Specifications, of these Special Provisions. In general, the work consists of installing asphalt berm, striping, slurry seal, traffic signal; and for all other work, items, or details to improve bicycle facilities that are required by the Drawings, Standard Specifications, of these Special Provisions. The estimate of construction quantities shown on the Proposal represent a preliminary estimate of the quantities of work to be performed and materials to be furnished. They are approximate only and are given as a basis for the comparison of bids only. The City of Richmond does not expressly or by implication agree that the actual amount of work and materials will correspond therewith and reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work that may be deemed appropriate or expedient by the City Engineer. Notice is hereby given that the following three documents must be submitted no later 2:00 p.m. on Tuesday, June 22, 2021. The bid due date is still 2:00 p.m. on Thursday, June 17, 2021: (1) Compliance Commitment Agreement (Ordinance 16-12 N.S. Business Opportunity Ordinance) (2) Bidder’s current Job Application Form (Ordinance 14-13 N.S. Ban the Box) (3) Sanctuary City Compliance Statement (Ordinance 12-18 N.S. Sanctuary City Contracting and Investment)

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.