Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 14, 2023

March 18, 2024

November 25, 2024

4375 Easley Dr

Renovation

No Information to Display

$500,000.00

Public - City

img_map_placeholder

4375 Easley Dr, West Palm Beach, FL

91

19

10

3

Subscribe to View Full Documents

As of January 4, 2024, the project has not been awarded. An award is expected to be made the second week of February, 2024. The East Central Regional Wastewater Treatment Facilities (ECR), through its agent, the City of West Palm Beach (City), is accepting bids from qualified and responsible Contractors to furnish and assume full responsibility for all labor, material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit to perform the above-referenced project. Final Questions Due October 19, 2023 at 5:00 p.m. 22-23-139 LA The Contractor must furnish the construction services required of Contractor by the Contract Documents, or necessary for the complete and proper construction of ECR Upgrade Electrical, Process Control & Communication Systems Project, if not expressly indicated or called for in the Contract Documents, and includes all labor, equipment, machinery, tools, materials, manufactured articles, supplies, documents, permits, traffic control, transportation, security and other services and incidentals, including fuel, power, light, water, sanitary facilities, temporary facilities and essential communications, and the costs of bonds, insurance, permitting, taxes warranties, general conditions, overhead and miscellaneous costs, necessary to perform the Project/ work (as defined below, in the Construction Drawings, technical specifications and General Conditions) to fulfill Contractor's obligations under the Contract 40172892, P320-20141

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects