Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 1, 2021

July 2, 2021

November 10, 2022

Morris Valley Road

Site Work

No Information to Display

$7,334,847.00

Public - State/Provincial

img_map_placeholder

Morris Valley Road, Harrison Mills, BC

Subscribe to View Full Documents

Construction of a 96 m long three span bridge with steel girders over Chehalis River and demolition of a single-lane existing bridge. Project includes construction of 0.71 km new two-lane roadway, grubbing, organic stripping, Type D excavations, borrow material, sub-grade construction, granular materials, bridge end fills, paving, riprap production and placement, placement of embedded boulders, drainage, roadside barriers, seeding, fencing and signs. The site is located along Morris Valley Road approximately 6 km north of intersection of Highway 7 and Morris Valley Road. Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia.

126 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects