Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

October 2, 2023

No Information to Display

131 N Main St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

131 N Main St, Bristol, CT

Subscribe to View Full Documents

The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Project scope includes multiple mechanical and electrical improvements throught the existing Bristol Police Department facility, including the following: a. Removal of the existing steam boilers and steam system and installation of new High Efficiency hot water boilers, and associated pumps, new hydronic hot water piping distribution and controls, new hot water unit heaters. b. Replacement of the existing air handing systems and return fans serving the facility. c. Replacement of the existing general and toilet exhaust fans on the roof of the facility d. New dedicated parking garage air handing system e. New split air cooled chiller system f. Minor ductwork modifications throughout the building g. Electrical gear upgrade/replacement h. Emergency Lighting and Exit sign upgrade and replacement i. Other Work indicated in the Contract Documents. All certified payrolls must list the hours worked and wages paid to All Persons who perform work ON SITE regardless of their ownership Reporting and payment of wages is required regardless of any contractual relationship alleged to exist between the contractor and such person. The Contractor shall, at its own expense, take out and possess all necessary permits required and licenses required by law and necessary for the prosecution of the work under this Contract; including the posting of all bonds and payment of all fees and charges incidental to the due andlawful prosecution of the work covered by the Contract. The City of Bristol does not waive permit fees for work performed under this contract. The City reserves the right to waive any informalities in the bid, to reject any or all bids, and to accept the bid that in its judgment is in its best interest.The Purchasing Agent reserves the right to reject any or all bids; or the bids for any one or more commodities Any questions regarding the proper classification should be directed to: Public Contract Compliance Unit Wage and Workplace Standards Division Connecticut Department of Labor 200 Folly Brook Blvd, Wethersfield, CT 06109 (860) 263-6790.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.