Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 19, 2021

December 15, 2021

August 17, 2023

12 Red Mill Rd

New Construction, Paving, Site Work

No Information to Display

$12,500,000.00

Public - City

img_map_placeholder

12 Red Mill Rd, South Easton, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Construction of a 1.69 MGD water treatment plant that will remove iron and manganese from three sources via pressure filtration DCAMM Standard GC Prequal Pkg. (Jan 18) 2 Section II: Detailed Project Description *Note: In order to get the best quality responses to this RFQ, the Awarding Authority is advised to provide as much information as possible in this section. The work consists of construction of a new 1.69 MGD water treatment plant to treat raw water from three existing wells (wells 3, 5, and 7). The Town of Easton is currently experiencing declining water quality in two of the wells. The proposed site includes a below grade finished water clear well, residual handling lagoons, stormwater bioretention areas, and a 6,900 s.f. metal building that will contain the treatment system. This system includes four vertical pressure filters, chemical feed and storage, piping, pumps and motors, air scour blower, and a future PFAS treatment area. The work includes, but is not limited to, hydraulics, civil/site, process mechanical, instrumentation and controls, architectural, structural, mechanical, electrical, plumbing, and. Construction Electronic .pdf copies of the interested General Contractor's SOQ application package must be received by the Awarding Authority on or before the Submission Deadline as set forth in Section I, as determined by the Awarding Authority's date/time stamp. RFQ for General Contractor Services Awarding Authority Name: Town of Easton - Easton Water Department Project Name: Red Mill Road Water Treatment Plant Project Number: 307-2002 Respondent General Contractor's Name: Respondent General Contractor's Address: Respondent General Contractor's Telephone #: Respondent General Contractor's Contact Person This Request for Qualifications ("RFQ") is issued pursuant to M.G.L. c. 149, 44D 1/2 . Firms interested in providing General Contractor services for the construction of the project described in Section I and Section II ("the Project") MUST submit a Statement of Qualifications ("SOQ") in response to this RFQ to the Awarding Authority as instructed in Section III and Section VIII, herein. o The General Contractor selection process for this Project is a two-phase process as set forth in M.G.L. c. 149, 44D 1/2 . The project delivery method for construction will be under M.G.L. c. 149. The Awarding Authority is prequalifying firms interested in providing General Contractor services for the Project through this RFQ prequalification process

77 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.