Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

October 2, 2023

February 5, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$230,000.00

Public - City

img_map_placeholder

Multiple Locations, Fontana, CA

51

8

5

Subscribe to View Full Documents

As of December 8, 2023, the project has not been awarded. A timeline for award has not been confirmed. The project will consist of installing Americans with Disabilities Act (ADA) compliant sidewalks and access return ramps, curb and gutter, street signing and striping to include bike lanes, the retrofitting/removal and the replacement of non-compliant sidewalk and curb within the project limits. This project will also include high-visibility crosswalks and street lighting. The proposed project is located within the City of Fontana on multiple roadways bordered by San Bernardino Avenue, Catawba Avenue, Valley Boulevard, and Juniper Avenue. Question Deadline 07/29/2023 at 2:00 PM Any questions pertaining to this project should be directed to Sid Lambert at phone number (909) 350- 7678 or email at slambert@fontana.org. The Contractor shall complete all work in every detail, within 90 Working Days after the date of Notice to Proceed, Compliance with the prevailing rates of wages and apprenticeship employment standards established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will also be required. Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Contract Documents. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of ninety (90) calendar days. The City reserves the right to reject any or all bids or waive any irregularity in any one or all bids received.

54 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.