Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 5, 2021

July 5, 2021

November 30, 2022

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$2,514,730.00

Public - City

img_map_placeholder

Multiple Locations, West Springfield, MA

Subscribe to View Full Documents

Contractor Qualification Highway Division The Town of West Springfield invites sealed bids from contractors for a Complete Streets Improvements Project. Proposed work activities include: performing all operations; furnishing all necessary labor, materials and equipment required for the shared path, sidewalks, ramps, crosswalks, pavement milling, hot mix asphalt paving, traffic lights and related work on Park Ave, Park Street, Main Street, Elm Street, Union Street and the Town Common in West Springfield. All work shall be substantially completed by October 31, 2022. Project shall be fully completed by November 30, 2022. No on-street work will be permitted between the dates of September 17, 2021 to October 3, 2021 and September 16, 2022 to October 2, 2022. The proposed design includes complete streets improvements at various intersections in West Springfield. Town Common The project includes the construction of a concrete shared use path to provide an off-street biking route that is comfortable for all ages and abilities. It will include new ADA compliant curb ramps, sidewalk improvements and landscape. Park Street The project includes new ADA compliant curb ramps, sidewalks sections replacement, two new high visibility crosswalks, roadway resurfacing, restriping of travel lanes and curb replacing. Park Avenue The transit stops will be consolidated and the bus stop will be relocated and improved with a turn-out and shelter. New ADA compliant curb ramps, crosswalks improvements, roadway resurfacing, restriping of travel lanes and curb replacing. Park Street, Main Street and Park Avenue Intersection The project includes new ADA compliant curb ramps, crosswalks improvements, roadway resurfacing, restriping of travel lanes, curb replacing and the installation of a new traffic light system Park Street, Union Street and Park Avenue Intersection The project includes improvements to the travel lane configuration, new traffic light equipment and signal optimization, new ADA compliant curb ramps, crosswalks improvements, roadway resurfacing, restriping of travel lanes, curb replacing.

90 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects