Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

October 16, 2023

April 8, 2025

S Main St

Paving, Site Work

No Information to Display

$3,500,000.00

Public - City

img_map_placeholder

S Main St, Maryville, MO

Subscribe to View Full Documents

The Work consists of reconstruction of South Main from South Avenue to Highway V. South Main Corridor Improvement Project (Phase II) - Maryville, MO The proposed work includes: Reconstruction of approximately 0.7-mile section of South Main Street Corridor from State Highway V to 285 th Street. The work consists of storm sewer system improvement, full depth street widening, mill and overlay, traffic signals, lighting, sidewalk, landscaping, and improvement to existing driveway accesses. Project Location: South Main Street, State Highway V to 285th Street, Maryville, Missouri Question Deadline 08/08/2023 at 2:00 PM CT

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects