Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2021

June 16, 2021

October 14, 2021

Thomson Bypass

Site Work

No Information to Display

$299,390.00

Public - City

img_map_placeholder

Thomson Bypass, Thomson, GA

Subscribe to View Full Documents

Relocate natural gas facilities that are in conflict with construction of the Thomson West Bypass The Work covered by these Specifications consists of and includes the performing of all operations and the furnishing of all plant, labor, material, supplies, equipment, and other facilities and things necessary or proper for or incidental to the construction and testing of natural gas distribution facilities, all complete, tested, accepted, and connected to the existing gas system. All Work shall be done in accordance with requirements of the CFR Title 49 Part 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards, as amended, and any applicable Standards which are hereby incorporated in these specifications by reference PIPE. All steel line pipe used in the Work shall be as listed below. Plastic pipe shall be PE 2406, as follows: Size SDR Coil/Joint Length (inches) (feet) 2 3/8 O. D. 11 500 Steel pipe shall be API5L, as follows: Size Wall Thickness Grade (inches) (inches) 2 0.154 X-52 4 0.156 X-52 BIDDER agrees to commence work under this Agreement on or before a date to be specified in a written Notice to Proceed of the OWNER and to fully complete the work within 120 consecutive calendar days from the Notice to Proceed date.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.