Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 28, 2021

September 3, 2021

August 31, 2022

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Columbus, OH

Subscribe to View Full Documents

The City of Columbus is accepting bids for Circuit 14041 Reliability Improvements CIP #670830-100002 the work for which consists of replacing over 100 wood distribution poles, installing 67,000 circuit feet of conductor, 2,500 circuit feet of underground cable, 350 feet of concrete encased conduit, 150 cross-arm assemblies, 100 porcelain fused cutouts, and 80 lightning arresters. In addition, four new electronic reclosers, three gang-operated air breaks, 3 solid blade disconnects, 6 fault indicators, 4 capacitor banks, one pad-mounted 5-way switchgear, and one manhole will be installed. QUESTIONS Questions pertaining to the drawings and specifications must be submitted in writing only to the City of Columbus-Division of Power, ATTN: Brad Norval, via email at btnorval@columbus.gov prior to April 21, 2021 at 4 PM local time.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.