Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 15, 2021

May 17, 2021

November 5, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$56,416.00

Public - City

img_map_placeholder

Multiple Locations, Centerville, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of May 5,2021 This project has been awarded for the amount of $56,415.94. Start date and completion date has not yet been established.** Project involves sealing and striping various parking lots and hiker biker paths throughout the City. The City of Centerville is soliciting proposals to provide all labor, equipment, and materials including traffic control necessary to clean, seal, crack seal, and stripe (re-trace) the parking lots and hiker-biker paths at various locations. Linear Foot Concrete Joint Milling and Repair, 12 inches wide C253 Linear Foot Concrete Joint Milling and Repair, 24 inches wide C253 Linear Foot Concrete Joint Milling and Repair, 36 inches wide Location-Specific Timing and Striping Details: o City Hall (100 W Spring Valley Rd) - Weekend work is preferred as there is high traffic in this parking lot during the weekdays in the daytime and evenings. Some evening work after 6PM may be possible. The contractor and City shall review dates for this work. o Striping: 3,130' of 4" White Parking Lot Stall Marking 8 White Handicap Symbols 337' of 5" White Transverse Lines o Stubbs Park Parking Lots (255 W Spring Valley Rd) - Work shall occur Monday thru Friday. Work will need to be staged to accommodate patron parking and to maintain access via one of the two access points at all times. The successful contractor will be provided detailed schedules of events so they may plan their work schedule. o Striping: 3,660' of 4" White Parking Lot Stall Marking 15 White Handicap Symbols 361' of 5" White Transverse Lines o Stubbs Park Walking Paths (255 W Spring Valley Rd) - Work shall occur Monday thru Friday. o Public Works (7970 South Suburban Rd) - Work in the front parking lot shall occur on Fridays. Work in the back parking lot shall occur in two phases on Fridays only. o Striping: 1,200' of 4" White Parking Lot Stall Marking 3 White Handicap Symbols 4 Straight Lane Arrows 108' of 4" Yellow Transveerse Lines 180' of 5" White Transverse Lines o Benham's Grove (166 N. Main St.) - Sealing & Striping must be done on Monday, Tuesday, or Wednesday during the day o Striping 1,441' of 4" White Parking Lot Stall Marking 4 White Handicap Symbols 233' of 5" White Transverse Lines 40' Double Yellow Line, each line 4" 40' of White 8" Channel Lines 3 White LaneArrows (1 Left, 1 Right, 1 Straight) Uptown NW Quadrant - Work in Uptown will need to be staged to accommodate patron parking and maintain traffic. Work must occur Monday thru Friday. o Striping: 1,615' of 4" White Parking Lot Stall Marking 7 White Handicap Symbols 427' of 5" White Transverse Lines 6 Straight Lane Arrows o Uptown NE Quadrant - Work in Uptown will need to be staged to accommodate patron parking and maintain traffic. Work must occur Monday thru Friday. o Striping: 737' of 4" White Parking Lot Stall Marking 3 White Handicap Symbols 246' of 5" White Transverse Lines o Cross Point Church (38 N. Main St) - Work shall occur Monday thru Friday. o Striping: 1,815' of 4" White Parking Lot Stall Marking 6 Handicap Symbols 526' of 5" White Transverse Lines 3 Straight Lane Arrows o Westerfield Dr. (84 W Franklin) - Work shall occur Monday thru Friday. o Striping: 83' of 4" White Parking Lot Stall Marking 1 Handicap Symbol o Crack Sealing at Yankee Trace Clubhouse (10000 Yankee St) - Work shall occur Monday thru Friday and shall be scheduled around events and high volume days at the golf course.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects