Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 20, 2021

September 6, 2021

November 5, 2021

5 Airpark Rd

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

5 Airpark Rd, West Lebanon, NH

Our team is requesting plans for this project.

Subscribe to View Full Documents

The proposed project includes upgrades to the terminal building and sand storage area. The base bid includes replacement of lighting and lighting controls, replacement of electrical panelboards, installation of a mini-split air conditioning unit, refinishing of existing exposed wood beams and columns, replacement of carpet in the terminal building; construction of a new cast-inplace concrete storage bay and divider wall and repair of an exterior wall at the maintenance building, and all other work associated as shown on the plans and specifications. Replacement of the exterior windows, aluminum storefront, man doors and skylights at the terminal building will be Additive Alternate No. 1. Replacement of the exterior building siding and building signage, and painting of the exterior concrete at the terminal building will be Additive Alternate No. 2. It Is Anticipated That a Contract Award Will Be Made by April 22, 2021. The Anticipated Notice to Proceed Is September 2021. The Bidder Shall Commence Work Under This Contract on or Before a Date to Be Specified in the Notice to Proceed and to Fully Complete All Project Segments Within Sixty (60) Consecutive Calendar Days After Notice to Proceed. The Contractor Shall Submit at the Preconstruction Meeting a Detailed Schedule of Construction Activities. The Owner reserves the right to reject any and all Bids and to waive any irregularity in Bidding. The successful Bidder will be required to furnish the necessary Bonds and Insurance Certificates. The City will award this project based on the City's discretion, and may or may not include any or all bid alternatives. Each bidder must deposit with his bid, security in the amount of 10% of the total amount of the bid. Bid security may be in the form of a certified check drawn upon a bank within the State of New Hampshire, or a bid bond executed by a surety company authorized to do business in the State of New Hampshire, made payable to the Owner. The successful bidder must furnish a 100% Performance Bond and a separate 100% Payment Bond and will be required to execute the Contract Agreement within 5 days following notification of the acceptance of his bid.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.