Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

January 13, 2024

2002 S Fletcher Ave

Paving, Site Work

No Information to Display

$180,000.00

Public - City

img_map_placeholder

2002 S Fletcher Ave, Fernandina Beach, FL

Subscribe to View Full Documents

SCOPE OF WORK : The project consists of providing all tools, labor, material, equipment and supervision for the demolition of a portion of the existing walkway and construction of a new approximately 254 ft by 6 ft wide dune walkover with ramps and handrails at the existing dune path labeled as Access Seaside Park Improvements on South Fletcher Avenue, in accordance with the construction plans prepared by Gillette & Associates dated January 26, 2023. If the Base Bid or the Base Bid plus the sum of any alternates fall into the criteria above requiring a Bid Bond, the bidder shall enclose a Certified Check or Bid Bond with each bid. A Certified Check or Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the CITY OF FERNANDINA BEACH as a guarantee that the Bidder will not withdraw its bid for a period of ninety (90) calendar days after Bid closing time. Bid Bonds or Certified Checks will be returned to unsuccessful bidders within 10 days of bid award. Successful bidders will receive their Certified Check or Bid Bond after the contract/agreement has been signed and a Performance and Payment Bond is received. CONTRACT TIME : The Owner has established a contract performance time of 110 calendar days from the date of Notice-toProceed. All work shall be substantially completed within the stated timeframe. This project may be subject to liquidated damages to be specified in the contract. PROJECT SCHEDULE : CONTRACTOR shall begin no later than fourteen calendar days from issuance of Notice to Proceed unless otherwise specified; all work must be completed within 110 calendar days of Notice to Proceed Specification questions during the bid period shall be submitted in writing to City Engineer, Charles George, cgeorge@fbfl.org with a copy to Purchasing Agent, Wanda Weaks, wweaks@fbfl.org. The City reserves the right, based upon its deliberations and in its opinion, to accept or reject any or all proposals. The City also reserves the right to waive minor irregularities or variations to the specifications and in the bidding process.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects