Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 22, 2022

May 23, 2022

July 7, 2022

To Be Determined

Site Work

No Information to Display

$1,200,000.00

Public - City

img_map_placeholder

To Be Determined, Temple, GA

Subscribe to View Full Documents

The Contract Project consists of the supply and installation of water meters for measuring potable water usage and in the installation, implementation, and use of fixed base automatic water meter reading systems. A fixed base automatic water meter reading system hereinafter shall be referred to as "AMI", Automated Metering Infrastructure, which is to be supplied as one of the following contract options: Entirely Service-Based (Contract 1), Utility-Owned Hardware (Contract 2), or Lease-to-Own (Contract 3). All constraints/limitations associated thereto will be the responsibility of the selected Proposer to manage in order to deliver a "turn-key" project within the awarded schedule of prices, as well as within the approved installation time frame. The scope of the work should be completed within 8 months (245 days) from the execution of the contract. The engineers estimate range is $700K - 1.2M. A liquidated damages provision shall be included in the contract between the City and the successful Proposer determined by final project schedule acceptance based on the target completion goals of the City. The City is requesting proposals for the supply, installation, and potentially maintenance (depending on Contract description) of water meters throughout the City; according to the desired specifications contained herein. The City shall enter into either an entirely service based agreement (Contract No. 1), an agreement in which the utility owns the AMI system hardware (Contract No.2), or a lease-to-own agreement (Contract No. 3) for the AMI system. City personnel must be able to access all collected data at any time in order to perform daily operations, provide customer support, and monitor system performance. The finished AMI system solution shall also provide for advanced data analysis through an effective meter data management (MDM) system. Specific vendors and applications in use at City of Temple are listed herein. Proposers who can demonstrate or verify proven integration to these existing systems are preferred. The City of Temple's goal is to ensure secure and reliable system integration and to eliminate duplicate entries for any new meter or meter exchange functions. In addition, preference will be given to Proposers with capability for expanded integration such that City of Temple users (e.g. Customer Service performing a remote disconnect/ reconnect or Billing personnel identifying malfunctioning meters) will be able to do most day-to-day functions through the existing Customer Information System (CIS) as contained within Caselle. Proposer Questions Accepted Until: June 11, 2021 5:00 pm "Proposer Questions Accepted Until: September 24, 2021 5:00 pm

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.