Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 25, 2021

May 24, 2021

October 2, 2021

Harrison Blvd

Paving, Site Work

No Information to Display

$2,459,104.00

Public - City

img_map_placeholder

Harrison Blvd, Ogden, UT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of May 28, 2021, the project has been awarded but award amount was not confirmed and the construction start date and completion date has not yet been established.** Harrison Boulevard from SR-39 to 7th Street. The project shall be governed by these contract documents, special conditions, specifics related to the work, and all provisions of the Manual of Standard Specifications and Manual of Standard Plans 2017 Edition published by the Utah Chapter of the American Public Works Association (APWA) and Ogden City's Engineering Standards for Public Improvements 2020 Edition which are applicable to the work are made a part of the Contract Documents by reference. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: Utility work including Sanitary Sewer main and laterals, large diameter Storm Drain install, and replacement of a Culinary Water main. Minor traffic signal work is also planned. Roadwork includes, but is not limited to: pavement ,median, C&G and sidewalk removal, road subgrade reprofiling, new C&G and sidewalk alignments. Bids shall be on a unit price basis. Unsealed or segregated Bids will not be accepted. The Work will be Substantially Completed 131 calendar days after the date of the Notice to Proceed. Bid security in the amount of five (5) percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and in accordance with Document 00 20 00, Section 2.3.D. The Owner reserves the right to accept or reject any or all bids or to waive any informality or technicality in any bid that best serves its convenience and/or is found to be in the best interest of the City. Bids shall remain valid for 45 days after the day of Bid opening. The three lowest bidders, per Document 00 20 00, Section 2.3 D, who withdraw their bid after Bid opening, but before expiration of said period, shall forfeit their bid security if Notice of Intent to Award to Bidder is made by owner. All contractors intending to submit a bid are REQUIRED to attend to obtain relevant information concerning the project. Bidders are advised that information affecting drawings, specifications, conditions, scope of the Work, etc. may be discussed. Any questions concerning the specifications for said project will be discussed at this time, and Bidders will be made aware of special conditions involved in the construction of this project. OWNER assumes no obligation to disclose information discussed at the pre-bid conference to Bidders who do not attend. Absent Bidders assume all risk of failure to attend. BidOpening Meeting ID: 823 0123 4831 Find your local number: https://us02web.zoom.us/u/kbhMmuudz Pre bid Meeting Meeting ID: 846 2018 4164 Find your local number: https://us02web.zoom.us/u/kecviCPFho

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.