Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2023

July 18, 2023

March 12, 2024

1100 Bowes Rd

Renovation

No Information to Display

$14,638,000.00

Public - Federal

img_map_placeholder

1100 Bowes Rd, Elgin, IL

Subscribe to View Full Documents

Performance includes, but is not limited to, the following: Demolition as required to perform system upgrades. Replacement of four (4) reinforced fiberglass, field erected cooling towers and associated piping systems and accessories, each with a capacity of 900 gallons per minute (GPM). Replacement of four (4) main facility chillers and associated pumps and accessories, each with a capacity of 300 tons of cooling. Replacement of multiple HVAC equipment including air handling units, fan powered induction boxes, variable air volume boxes, constant volume boxes, unit heaters, exhaust fans, return fans, leak detection, circulation pumps, piping system valves, fittings and insulation. Refurbishment and replacement of all components of five (5) air handling units serving the Operations Area. Replacement and upgrade of the building automation system. Replacement of building steam humidification system. Replacement of building electrical components including transfer switches, motor starters, variable frequency drives, light fixtures, emergency lighting, wiring devices; C90 TRACON is a NAS facility, operating 24 hours per day and providing services critical to safety; therefore, work performed on or near this facility (and by extension, equipment) must be planned and conducted in a manner that minimizes or eliminates deterioration in the quality or quantity of services provided to the NAS. This may require, among other adaptations, working during non-standard business hours or using non-standard techniques to eliminate noise, obstructions to visibility from ATCTs, and shut down of equipment essential to operations. The continued operation of all equipment in the NAS and the safety of life and property are paramount considerations in all work conducted under this contract.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.