Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 25, 2021

April 15, 2021

June 30, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$468,903.00

Public - City

img_map_placeholder

Multiple Locations, Athol, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Contractor Qualification Highway Division Roadway Reclaiming, Resurfacing and Related Work at various locations to be completed by 6/30/21 with option to renew for one year. Work consists of reclaiming approximately 20,289 S.Y. of roadway, milling approximately 17,333 S.Y. of roadway, placement of approximately 5,373 Tons of hot mix asphalt, and related work to include structure adjusting and installation of asphalt berm. he scope of this Contract consists of furnishing all materials and labor necessary for the completion of the Work as specified herein. The Work consists of reclaiming and resurfacing streets, as listed in Appendix B, as well as cold planing, furnishing and replacing castings, adjusting structures, installation of asphalt berm, and related work to include sweeping of streets in preparation of paving. Prior to invoicing, the Contractor shall submit to the Owner a breakdown of all associated costs per street for all items listed. Individual load slips for HMA, gravel borrow, and tack coat shall be submitted to the DPW along with the payment application. Scope of Work: Silver Lake St from Crescent St to existing match line North of #858 Mill to depth of 2 inches Replace worn castings as directed Adjust/rebuild structures as needed Remove existing HMA berm Replace existing HMA berm Sweep street in preparation of HMA Tack coat surface in preparation of HMA Place 2 inches of top course HMA Batchelder Rd from Pleasant St to South Athol Rd Full Depth Reclamation Grade/shape in preparation of HMA Replace worn castings as directed (water boxes only on this road) Adjust/rebuild structures as needed (water boxes only on this road) Place 1.5 inches binder course Tack coat surface in preparation of top course HMA Place 1.5 inches of top course HMA

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects