Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 11, 2021

June 28, 2021

August 23, 2022

5250 Avenue des Sauges

Renovation

No Information to Display

$857,000.00

Public - State/Provincial

img_map_placeholder

5250 Avenue des Sauges, Quebec, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1450913 Deadline for receipt of complaints: 2021-03-01 Electronic submission accepted: No Expected duration of the contract (in months): 9 Estimated value: $ 732,400 to $ 5,283,199 The Premier-Seigneuries School Services Center wishes to retain the services of a construction contractor to redo the interior finishes of its Cap-Soleil 2 school located at 5250 avenue des Sauges, Quebec (Quebec) G1G 3V6. The main works related to this project are: These works are mainly repairs of interior finishes and electromechanical type. Main works without being limited to: o Interior finishes o Complete repair of cardboard tile ceilings with acoustic tiles; o Repair of existing floor finishes with a flexible coating (premises); o Repair of existing floor finishes with ceramic tiles (corridors); o Refinishing of interior stairs; o Finishing of walls and new paint o Installation of ceramic on the corridor walls where the walls are not protected; o Replacement of integrated furniture; o ETC. o Mechanical o Various plumbing work; o Various ventilation work; o ETC. o Electricity o Replacement of fluorescent-type lighting with tubes by LED lighting; o Arrangement of replaced equipment; o Installation of dimmers on new fixtures; o Replacement of electrical wiring; o ETC. o General contractor o Coordination of work; o Relocation and protection of property and furniture; o ETC. Completion schedule Phase 1: June 28 to August 13, 2021 (work site) Clarification of the work schedule o School holiday period (June 28, 2021 to August 20, 2021) o Day and evening work will be permitted; o The contractor must also ensure the cleanliness of the corridors and classrooms in the non-affected sectors; o Week of August 16, 2021, provisional acceptance and submission of phase 1 end- of-work documents (TQC, maintenance manuals, letters of guarantee, ETC.); o From August 16 to August 20, 2021 correction of deficiencies; o August 24, 2021, provisional acceptance. Phase 2: June 29 to August 12, 2022 (worksite) Clarification of the work schedule o School holiday period (June 29, 2022 to August 19, 2022) o Day and evening work will be permitted; o The contractor must also ensure the cleanliness of the corridors and classrooms in the non-affected sectors; o Week of August 15, 2022, provisional acceptance and submission of phase 1 end- of-work documents (TQC, maintenance manuals, letters of guarantee, ETC.); o From August 15 to August 19, 2022 correction of deficiencies; o August 23, 2022, final acceptance of the project.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.