Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 3, 2021

April 19, 2021

June 4, 2021

16475 Bordeaux Dr

Demolition, New Construction, Site Work

No Information to Display

$178,400.00

Public - County

img_map_placeholder

16475 Bordeaux Dr, Reno, NV

Subscribe to View Full Documents

Question Cutoff Date: 2/26/2021 08:00 PM (ET) ENGINEER'S ESTIMATE: $180,000 - $220,000 PROJECT SCOPE: Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the installation of a second Booster Pump including demolition of existing facilities, piping retrofit, electrical and HVAC improvements, excavation, backfill, compaction, and reinforced concrete. Please Note: Face masks are required and social distancing will be enforced. Contractors will be allowed no more than two representatives per company in attendance. Bid results and the bid tabulation will be posted on NGEM and bidders will be notified electronically of the results. TMWA reserves the right to reject any or all bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced, or conditional bids, and to reject the bid of any bidder if TMWA believes that it would not be in the best interest of TMWA to make an award to that bidder. TMWA also reserves the right to waive informalities. Bids will be evaluated as prescribed in Nevada Revised Statute 338.147. ANTICIPATED START DATE: On or Before April 19, 2021 COMPLETION DEADLINE: June 4, 2021 The Contractor shall furnish all work, labor, services, supplies, materials, equipment, tools, traffic control operations, transportation, supervision, appliances, appurtenances and incidentals required for the prompt and efficient completion of the project described as the installation of a second Booster Pump including demolition of existing facilities, piping retrofit, electrical and HVAC improvements, excavation, backfill, compaction, and reinforced concrete. (Project) as described in the Contract Documents and in accordance with the contract provisions, Plans, and Specifications, together with all work incidental or reasonably inferable which is necessary to produce the results intended by the Contract Documents (collectively, the Work). Contractor shall be responsible for the supervision and coordination of the Work, including the construction means, methods, techniques, sequences and procedures utilized, unless the Contract Documents specifically provide otherwise. The Contractor represents and warrants that it has fully investigated the nature, locality and site of the Work and the conditions and difficulties under which it is to be performed, and that it enters into this Agreement on the basis of its own examination, investigation and evaluation of all such matters and is in no way relying upon any opinions or representations of the Owner, or any of their respective officers, agents, servants, or employees with respect thereto.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.