Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 2, 2021

April 1, 2021

August 29, 2021

Arch St

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Arch St, Macon, GA

Subscribe to View Full Documents

As of 3/24/2021 project was not yet been awarded. No estimated time frame yet. All bid questions must be submitted to the Owner by 10:00 A.M.The Bidder should attend the pre-bid meeting in its entirety. The Project consists of construction of a parking facility with new pavement, curbing, underground stormwater storage and bioretention treatment areas. The Project will be awarded in one Contract. Each Bid must be accompanied by a Bid Bond in the amount of 10% of the Bid. Fifty-one percent (51%) of the Work under the Contract Documents must be self-performed by the General Contractor. The Project will be awarded by base bid on a lump sum basis for the performance and completion of all Work required by the Contract Documents. The Contract Documents include, but may not be limited to, the Instructions to Bidders, Contract Agreement, General Conditions, Drawings, Specs. (Divisions 01 through 46, inclusive, where applicable), and Bid Bond, Performance Bond, and Payment Bond. Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of MWA Third Street Parking, Third Street at Arch Street. The Project consists of construction of a parking facility with new pavement, curbing, underground stormwater storage and bioretention treatment areas. TIME OF COMPLETION.- (150) consecutive calendar days

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.