Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 15, 2021

May 3, 2021

September 24, 2021

10 Rue de l'Académie

Renovation

No Information to Display

$226,622.00

Public - State/Provincial

img_map_placeholder

10 Rue de l'Académie, Quebec, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1440824 Deadline for receipt of complaints: 2021-01-27 Electronic submission accepted: No Expected duration of the contract (in months): 9 Estimated value: $ 200,000 to $ 264,199 Nature of the Tender Guarantee: Guarantee Bank draft Certified check (certified) Money order Irrevocable letter of guarantee Value of the Bid Security (amount or percentage) 10% of the price proposed in its bid The Premiers-Seigneuries School Services Center wishes to retain the services of a construction contractor to replace the interior lighting of its Académie Sainte-Marie school located at 10, rue de l'Académie, Quebec (Quebec) G1E 4W1. The main works related to this project are: These works are mainly of the electromechanical type. Main works without being limited to: Electricity Replacement of fluorescent type lighting with tubes by LED fixtures. Disposal of replaced equipment Installing dimmers on new fixtures Replacement of electrical wiring ETC General contractor Coordination of work Complete renovation of some suspended ceilings Opening and closing of ceilings for electrical work. Modifications to existing ceilings (for electrical work) Relocation and protection of property and furniture Etc. Work schedule May 3 to September 24, 2021 (worksite) Clarification of the work schedule School period (20-21) - May 3, 2021 to June 25, 2021 Before the end of the school year, work in the classes and corridors must be carried out in the evening. In order not to interfere with school activities, evening work will be done in coordination with the client and will begin after 4:30 p.m. and must be completed before 5 a.m. the next morning. The weekend work will be done in coordination with the client and will begin after 4:30 p.m. on Friday and must be completed and before 5 a.m. on Monday morning. The contractor must ensure that the lighting is in good working order before the students arrive. The contractor must also ensure the cleanliness of the corridors and classrooms before the arrival of the students. The contractor may leave the ceiling tiles open during the work. However, he should not let anything hang from the ceilings during this period. School holiday period (June 28, 2021 to August 20, 2021) Daytime work will be permitted School period (21-22) - August 23, 2021 to September 24, 2021 From August 23, 2021, work in the classrooms and corridors must be carried out in the evening. In order not to interfere with school activities, evening work will be done in coordination with the client and will begin after 4:30 p.m. and must be completed before 5 a.m. the next morning. The weekend work will be done in coordination with the client and will begin after 4:30 p.m. on Friday and must be completed and before 5 a.m. on Monday morning. The contractor must ensure that the lighting is in good working order before the students arrive. The contractor must also ensure the cleanliness of the corridors and classrooms before the arrival of the students. The contractor may leave the ceiling tiles open during the work. However, he should not let anything hang from the ceilings during this period. Week of August 23, 2021, provisional acceptance and submission of end-of-work documents. (TQC, maintenance manuals, warranty letters, ETC.) From August 30 to September 17, 2021 correction of deficiencies. September 24, 2021, final acceptance of the project Performance bond and obligation bond for wages, materials and services of each corresponding 50% is required.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects