Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 4, 2021

April 5, 2021

June 28, 2021

Route 80 At the Toll Plaza

Site Work

No Information to Display

$293,400.00

Public - State/Provincial

img_map_placeholder

Route 80 At the Toll Plaza, San Francisco, CA

Subscribe to View Full Documents

As of 3/16/2021 project was not yet been awarded. No estimated time frame yet. MTC is seeking bids for the construction of roadside infrastructure downstream of the San Francisco-Oakland Bay Bridge (SFOBB) toll plaza in the High Occupancy Vehicle (HOV) Lane1. The roadside infrastructure will be used to deploy a Vehicle Occupancy Detection (VOD) system as part of a Phase 2 pilot project. The VOD system will be integrated with the existing toll collection system and FasTrak back office system. VOD system equipment will be installed on poles located approximately 50- to 100-ft downstream of the toll plaza canopy and will be used to verify tolls based on vehicle occupancy in Lane 1 during HOV hours. The pilot project will include the following physical improvements: 1) Installation of two new Caltrans standard poles with mast arms (MTC-furnished items) and foundations, approximately 60-ft apart; 2) installation of new conduit, pull boxes, and cables for power and communications to the VOD system equipment; and 3) installation of VOD system equipment (i.e., cameras, illuminators, laser trigger, and pole-mounted cabinets) onto the two new Caltrans standard poles. The Civil Contractor will be responsible for performing the work described in improvements 1 and 2. Improvement 3 will be performed by others. Questions Due Date: Feb 17th 2021, 5:00 PM PST Good morning, When you pre-register you get a notice stating the meeting starts at 1:30. that just means that Zoom will be available starting at 1:30, the Pre-bid Conference will start at 2:00 p.m. Thank you. The scope of work includes, but is not limited to: o Installation of infrastructure necessary for the operation of a VOD implementation in Lane 1 of WB I-80 o Installation of two new owner-furnished Caltrans standard poles/mast arms, and furnish and installation of two corresponding pole foundations, approximately 60-ft apart o Furnish and installation of one side arm post o Furnish and installation of new conduit, pull boxes, and conductors/cables for power and communications to the VOD system equipment o Furnish and installation of a new ground-mounted unmetered electrical service pedestal o Furnish and installation of new fiber optic cable, termination panels, and fiber terminations.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.