Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 3, 2025

No Information to Display

NW Irvinedale Dr & NW 18th St

Site Work

No Information to Display

$3,325,000.00

Public - City

img_map_placeholder

NW Irvinedale Dr & NW 18th St, Ankeny, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reconstruction of the NW Irvinedale Drive and NW 18th Street intersection to improve traffic capacity, mobility and safety. It is anticipated that dedicated left and right turn lanes will be provided at all four legs of the intersection. Traffic signal improvements will also be needed to accommodate the new turn lanes. The reconstruction will provide an urban cross section on all legs of the intersection. Storm sewer infrastructure and subdrain are also included with the proposed improvements. NW Irvinedale Drive and NW 18th Street are arterial streets that serve a large portion of the northwest part of the City. This segment of NW Irvinedale Drive is currently a two-lane rural section with old asphalt pavement. The intersection's current geometry creates bottlenecks at times due to the lack of left and right turn lanes and there are some locations along NW Irvinedale Drive with steep side slopes which are considered potential safety issues. The continued growth on the City's northwest side will likely require improving the NW Irvinedale Drive and NW 18th Street intersection within the next several years. As December 22, 2022, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.