Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$2,220,000.00

Public - City

img_map_placeholder

Multiple Locations, Ankeny, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Improvements to address safety, capacity, functionality, sedimentation, erosion and associated issues within the Tributary to Four Mile Creek, east of St. James Place, between NE 47th Street and NE 54th Street. The improvements may include clearing and grubbing to remove flow impediments, reshaping the channel to establish stable slopes, reconnection to the floodplain, reestablishing the channel bottom, providing toe protection, repairing gully erosion, repairing undermined outlet structures, repairing and modifying an existing storm water detention basin and establishing native/wetland plantings. Permanent drainage easements may need to be acquired in conjunction with this project. The purpose of this project is to stabilize the channel, repair gully erosion, repair and modify a storm water detention basin and repair outlet structures which have caused safety and functionality concerns. The project costs are shown for the survey, concept plan and design work to be completed in 2022 and 2023 with construction of the project scheduled in 2024. As December 22, 2022, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.