Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 11, 2021

April 12, 2021

September 4, 2021

225 Canal St

Renovation

No Information to Display

$1,793,950.00

Public - State/Provincial

img_map_placeholder

225 Canal St, Salem, MA

Subscribe to View Full Documents

O'Keefe Complex Roof Replacement, replace existing EPDM roof with fully adhered white PVC roof membrane. Includes, not limited to, replacing & waterproofing raised concrete plaza & concrete patching, replace clerestory Kalwall windows, & add humidification to gym. Sub Bid Category Division 7 - Thermal & Moisture Protection, 07 00 01 Waterproofing, Dampproofing & Caulking FSB, 07 00 02 Roofing & Flashing FSB, Division 8 - Openings, 08 00 01 Metal Windows FSB. General Bid Deadline 2/11/21 Time 11:00 A.M. Contractor Qualification DCAMM Certificate General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (considering all alternates),and made payable to SALEM STATE UNIVERSITY The "Salem State University O'Keefe Complex: Roof Replacement, Plaza Repair & Gym Humidification" project primarily consists of replacing the existing EPDM roof with a fully adhered white PVC roof membrane. The Work also includes, but is not limited to, replacing and waterproofing a raised concrete plaza and concrete patching, replacing clerestory Kalwall windows, and adding humidification to the existing gymnasium. This work will be pre-ceded by an infra-red roof scan to note any deficiencies in the sub-structure and the roof will be rescanned after the project in order to determine any deficiencies in the work performed. This project will be performed in an existing building and services to the building will be expected to be consistent and maintained throughout the project The Contractor shall commence the Work under this Contract on the date specified in the written "Notice to Proceed," and shall, within 100 days after such date, bring the Work to Substantial Completion and to the point at which a Certificate of Agency Use and Occupancy may be issued, and shall bring the Work to Final Acceptance within 45 days after the date specified for Substantial Completion.

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.