Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 4, 2021

May 3, 2021

June 30, 2022

Multiple Locations

Paving, Site Work

No Information to Display

$4,358,301.00

Public - City

img_map_placeholder

Multiple Locations, Golden Valley, MN

125

15

6

6

Subscribe to View Full Documents

As of March 22 2021 project was awarded to GMH Asphalt amount of $4,358,301.35, starting in early May. Major quantities for the Work include. Salvage/Remove Bituminous Pavement 21,650 SY Clearing/Grubbing 25 TREE Common Excavation 31,400 CY Select Granular Borrow 41,500 TONS Class 5 Aggregate Base 9,500 TONS Bituminous Mixture 5,125 TONS 4"-6" Concrete Walk 1,100 SF Concrete Curb and Gutter 13,000 LF 6" Concrete Driveway Pavement 1,650 SY Sanitary Sewer Lining 3,700 LF Sanitary Sewer Service Wye Grouting/Liners 55 EA Sodding/Hydroseeding with 4-Inch of Topsoil 22,700 SY 6"-12" PVC (C-900) Water Main 6,400 LF 6"-8" Gate Valve and Box 26 EA 12" Gate Valve and Box 8 EA F&I Hydrant 9 EA 12"-33" Reinforced Concrete Storm Sewer Pipe 3,250 LF Drainage Structures & Castings 43 EA Substantially Completed- September 17, 2021 Final completion- June 30, 2022 2021 Pavement Management Project Area: Aquila Avenue North (23rd Avenue North to Medicine Lake Road), Zealand Avenue North (23rd Avenue North to Aquila Avenue North), Xylon Avenue North (23rd Avenue North to Medicine Lake Road), 23rd Avenue North (Cavell Avenue North to Xylon Avenue North), Rose Manor (Aquila Avenue North to Zealand Avenue North), 24th Avenue North (Zealand Avenue North to Wisconsin Avenue North). Removal of bituminous pavement. Also, water main replacement, sanitary sewer lining, subgrade preparation, installation of storm sewers, aggregate base, granular borrow, bituminous pavement, concrete pedestrian ramps, concrete walk, concrete curb and gutter, landscaping, restoration, and utility repairs.

60 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects