Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 7, 2023

No Information to Display

300 Rodgers Blvd

Paving, Site Work

No Information to Display

$100,000,000.00

Public - State/Provincial

img_map_placeholder

300 Rodgers Blvd, Honolulu, HI

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Department of Transportation (DOT), Airports Division seeks the services of qualified firms to provide construction management services for Runways and Taxiways Shoulders Rehabilitation at Daniel K. Inouye International Airport These services are anticipated to be immediately required and will have a completion time of approximately six hundred seventy (670) calendar days from the Notice to Proceed date Individuals or firms shall email a PDF file of their response to the attached written questionnaire which can be viewed under "Files." The PDF file shall be named as follows: "AO1021-28_CM_RFQ_Year.Month.Day_Firm Name" and e-mailed to dot.air.engineering@hawaii.gov with the Year. Month.Day portion of the file name being in two digit format (example: 13.09.01). The response to the questionnaire will be evaluated by the following criteria: 1. Experience and professional qualifications relevant to the project - 35% 2. Past performance on projects of similar scope for public agencies or private industry, including corrective actions and other responses to notices of deficiencies - 33% 3. Capacity to accomplish the work in the required time - 32% Individuals or firms who are not on the DOT's qualified list, and wish to be considered in the selection for this project must also submit a separate PDF file, named the "Company's Name", e-mailed to dot.air.engineering@hawaii.gov, and shall include the following: 1) letter of interest (including an email address(es) for notification of future notices), 2) Completed DPW Form 120 or Standard Federal Form 330 and 3) any other related information. Campaign contributions by State and County Contractors. Contractors are hereby notified of the applicability of Section 11-355, HRS, which states that campaign contributions are prohibited from specified State or county government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body. For more information, contact the Campaign Spending Commission at (808) 586-0285. If there are any questions, please call Greg Garcia, at (808) 838-8829 As of July 27, 2022, the issuance of short-listed firms has not been released. The design firm selection has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects