Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 1, 2021

April 1, 2026

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Cincinnati, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Direct questions or information requests related to this RFQ to: msd.procurement@cincinnati-oh.gov RFQ Questions / Comments Deadline JANUARY 8, 2021, 1:30 p.m. (Cincinnati, Ohio Time) A general outline of work required is provided in this RFQ. It is not intended to be all-inclusive, as a detailed scope of work will be developed during negotiations with the selected offeror. Services provided in the planning phase include, but are not limited to, project management, public relations/community outreach, evaluation of existing MSD assets, data collection and review, modeling, hydrologic evaluation, risk assessment and development of a business case evaluation (BCE). The selected offeror shall provide all engineering, alternatives analysis, estimating, risk assessment, and other planning services for final business case evaluation documentation and develop an approach that takes into account flexibility, available land, accessibility, maintenance, reliability, operations, and constructability. Services provided in the detailed design phase include, but are not limited to, project management, public relation/community outreach, geotechnical and surveying services, permit coordination, hydrologic evaluation, risk assessment, development of property acquisition documentation, estimating, and detailed design. The selected offeror shall provide all engineering and other detailed design services required to submit construction plans and details, specifications, and opinion of probable construction cost. Services provided in the construction services phase include, but are not limited to, constructionadministration, support through bidding, materials testing and field engineering. The anticipated term of the contract resulting from this RFQ is five years. For technical questions or issues related to your submission, please contact Bonfire directly at support@gobonfire.com or 1 (800) 354-8010, ext. 2. The support team is available Monday-Friday, 8:00 a.m. - 8:00 p.m. ET. Competition shall be generated to the maximum extent practicable, including opportunities for small business enterprises through the MSDGC Small Business Enterprise (SBE) Program. This project shall have a 15% SBE inclusion goal. The method of contractor selection has not been determined at this time.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.