Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 30, 2024

November 29, 2024

May 31, 2027

Gordon Rd & Campbell St

New Construction, Site Work

No Information to Display

$29,700,000.00

Public - State/Provincial

img_map_placeholder

Gordon Rd & Campbell St, Regina, SK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

Regina Public School Division (RBE), Regina Catholic School Division (RCS), Ministry of Education (MoE), and the Government of Saskatchewan (GOS) are proceeding with development of the new Harbour Landing West Joint-use School and City Space. RBE, RCS, MoE, and the GOS, are soliciting written responses through this Request for Pre-Qualification ("RFPQ") from qualified firms to provide general contracting services for the Project. The intention is for this Pre-Qualification to identify contractors that are capable of performing the work. The short list will consist of all proponents that meet the Prequalification requirements. 1. The facility is approximately 10,194 gross square meters of school, child care, and City of Regina space, which will serve students from pre-kindergarten to grade 8. The school will have an opening enrollment of: RBE - 500 opening/500 core and RCS - 250 opening/350 core. Most of the building's footprint is three storeys. 2. The City of Regina space is approximately 262 square meters (included above). 3. The facility includes an integrated child care facility, approximately 576 square meters (included above). 4. The site is designed to accommodate six relocatable locations, each potentially three storeys high. The installation of four ground floor relocatables for RBE may be included in the general contractor scope. 5. The project is expected to start construction in Spring of 2025 with school occupancy in Summer of 2027. 6. The school site is located on a greenfield site in the proposed new Harbour Landing West development of Regina. Deadline for Questions September 19,2024 All inquiries from Proponent's until an agreement is executed shall be directed to the RFQ Process Manager: Attention: James Holtom Project Manager, JPH Consulting reception@jphpm.ca CC to: Troy Smith Design Project Lead, Group2 Architecture Troy.Smith@group2.ca

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects