Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 21, 2024

April 12, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$127,000,000.00

Public - City

img_map_placeholder

Multiple Locations, San Diego, CA

468

12

11

3

Subscribe to View Full Documents

Bid Valid - 180 Days Estimated Bid Value - $127,000,000 Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% SCOPE OF WORK: (S-12013 Alvarado 2nd Extension Pipeline) The project consists of the construction of approximately 2.17 miles (11,500 LF) of 24-inch welded steel pipeline and approximately 4.26 miles (22,500 LF) of 48-inch welded steel pipeline and associated appurtenances from West Mission Bay Drive and Sea World Drive to east I-805, along Friars Road. This project also includes the replacement of approximately 1.64 miles (8,650 LF) of existing 12-inch asbestos cement water distribution main along Sea World Drive and approximately 2.10 miles (11,100 LF) of 16-inch asbestos cement water distribution main along Friars Road and Fashion Valley Road with new 12-inch and 16-inch PVC distribution mains. The work includes trenchless construction within Caltrans right-of-way limits at State Route-163, open-cut construction within Caltrans right-of-way limits at the I-5 and I-805 overpass crossings and new Bikeway Improvements. The project will also include construction of a new 536/390 Pressure Reducing Station. The work includes associated cathodic protection, street resurfacing, curb ramps, and all other incidental work. (B-22025 Alvarado 2nd Extension Pipeline Bikeway Improvements) The project consists of Bike Lane Improvements along Sea World Drive (between Mission Bay Blvd and Pacific Highway), Friars Road (between Sea World Dr and Fresno St) and Fashion Valley Rd (between Friars Rd and Riverwalk Dr). Refer to plans 42092-D. 1.1. The Work shall be performed in accordance with 1.1.1. The Notice Inviting Bids and Plans numbered 40630-01-D through 40630-201-D, Traffic Control Plans numbered 40630-T01-D through 40630-T237-D and Alternate Items per Plans Numbered 42092-1-D through 42092-24-D, inclusive.

138 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.