Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 26, 2021

June 28, 2021

August 13, 2021

143 Rue des Feux Follets

Renovation

No Information to Display

$188,200.00

Public - State/Provincial

img_map_placeholder

143 Rue des Feux Follets, Quebec, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1431690 Deadline for receipt of complaints: 2021-01-04 Electronic submission accepted: No Expected duration of the contract (in months): 9 Estimated value: $ 105,700 to $ 199,999 Nature of the Tender Guarantee: Guarantee Bank draft Certified check (certified) Money order Irrevocable letter of guarantee Value of the Bid Security (amount or percentage) 10% of the price proposed in its bid Performance bond and obligation bond for wages, materials and services of each corresponding 50% is required. The Première-Seigneuries School Services Center wishes to retain the services of a construction contractor for toilet repair work at its Sous-Bois school. Mainly, the work consists of the repair of the toilets of the building and the replacement of all sanitary appliances and tanks. Achievement schedule June 28, 2021 to August 13, 2021 (worksite) Clarification of the work schedule The contractor may request an exemption from the CCQ in order to be able to work during the construction holidays. Failure to comply with this request, the contractor must assume the costs of accelerating the work to meet the schedule. End of work on August 13, 2021. (construction site) August 21, 2020, provisional acceptance and submission of end-of-work documents. (TQC, maintenance manuals, warranty letters, ETC.)

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects