Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 12, 2021

February 11, 2021

June 25, 2021

To Be Determined

New Construction, Site Work

No Information to Display

$502,491.00

Public - City

img_map_placeholder

To Be Determined, Smith Valley, NV

Subscribe to View Full Documents

The Work generally includes the following: Construction of 1) a new wellhouse over an existing functioning well including cast in place concrete foundation and slab, wood frame building, piping, valves, and fittings, chemical injection facilities, electrical, heating, ventilation, rotate and connect existing vertical turbine pump and underground site piping and system connections, 2) Install new electrical docking station and manual transfer switch at two existing booster pump stations, and 3) all the related incidental work and appurtenances. One additive alternate includes providing a mobile standby generator. Estimated Value: 250,000-300,000 The Work generally includes the following: Construction of 1) a new well house over an existing functioning well including cast in place concrete foundation and slab, wood frame building, piping, valves, and fittings, chemical injection facilities, electrical, heating, ventilation, rotate and connect existing vertical turbine pump and underground site piping and system connections, 2) Install new electrical docking station and manual transfer switch at two existing booster pump stations, 3) all the related incidental work and appurtenances. One additive alternate includes providing a mobile standby generator. The Work is located within Douglas County. The well is located immediately south of State Route 208 and the two booster pump stations are located north of State Route 208 in the community of Topaz Ranch Estates. All work will lie within Owners existing easements.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.