Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 6, 2021

February 23, 2021

April 24, 2021

Veterans Pkwy

Site Work

No Information to Display

$1,883,966.00

Public - County

img_map_placeholder

Veterans Pkwy, Reno, NV

Subscribe to View Full Documents

Installation of 24" and 20" Reclaimed Water Main from STMWRF to Veterans Parkway, approximately 5,850 feet. Work also includes installation of pressure reducing valve and meter, valves, air release valves, blow offs and other appurtenances. All Work not specifically identified in this Section shall be considered incidental to other items; no special payment will be given for incidental work. The Contractor may choose to install imported trench backfill material instead of using the excavated trench material. Imported trench backfill material shall meet the SSPWC Blue Book. The Owner will not pay extra for any imported trench backfill material. The Contractor is advised to review the geotechnical report and become familiar with the soils in the area. The Contractor shall install trench backfill using crushed rock base where specified in the plans. Prior to performing any demolition work, the area to be demolished shall be measured and agreed upon by the Engineer and Contractor. If demolition occurs prior to this measurement and agreement with the Engineer, the Engineer will measure only the area that, in the opinion of the Engineer, should have been the limits of demolition. Repairs to areas outside of these demolition limits, as determined by the Engineer, shall be replaced or reconstructed at no cost to the Owner.

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.