Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 1, 2023

No Information to Display

N Melvina Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

N Melvina Ave, Niles, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of July 31, 2023, an engineer has been selected. The stage of design and a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The Village of Niles will be accepting qualifications for providing: Professional Services for Melvina Avenue Improvement Concept Design Phase II Roadway Design Watermain Improvement Design. The Village plans to rehabilitate Melvina Avenue from Touhy Avenue to Gross Point Road. The project is programed for TIF and water funding sources. The Village also intends to replace a portion of the existing Melvina Avenue watermain from Touhy Avenue to Gross Point Road. The watermain work will be an advance contract funded with local funds. The Village has purchased the adjacent Grainger property and has a good working relationship with the businesses in the area. There may be an opportunity to place the watermain in an easement outside the western Right of Way line. There are three primary services required for this Project: 1. Concept Design and Traffic Engineering 2. Watermain Improvement Design 3. Phase II Roadway Design 4. Right-of-Way Negotiation and Acquisition Support The respondent must submit a team covering all three portions of the scope of work. The total project construction budget, excluding design and professional fees, is: $1,500,000. The budget breakdown is as follows: Roadway Improvements: $900,000 Watermain Replacement: $600,000 As of November 12, 2020 this project is seeking qualifications for designer. Engineering Contract approval is expected in January 2021. Concept design will be complete by April 30, 2021. Phase II roadway design is projected to start early April 2021 and be completed by late October 2021. The schedule may be delayed based on redevelopment activities. Roadway letting is scheduled for summer 2022 or may be delayed to coincide with Touhy Triangle Redevelopment. The watermain design is expected to be slated for late spring 2022 bidding and mid summer 2022 construction. If the selected consultant sees value in packaging both the watermain and roadway project together, the Village is willing to consider that option. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects