Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 12, 2023

No Information to Display

14 Wing

New Construction, Site Work

No Information to Display

$27,000,000.00

Public - Federal

img_map_placeholder

14 Wing, Greenwood, NS

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference Number 0000256435 Defence Construction Canada (DCC) invites general contractors to express their interest in providing all labour, materials, and equipment necessary to construct a new Refuelling Tender Garage at 14 Wing Greenwood, NS. Work included in this project includes the general construction and site improvements for a new refuelling tender garage including but not limited to civil work, excavation, complete building structure and finishes and site work (including asphalt and a new parking lot), as well as the installation of steam distribution systems shallow inverted trench (SIT) and building Integrated Automation system (BACNET), located at Greenwood, NS. The total building size is approx. 2,558 m2, and the total Site Developed Area is approx. 13,655 m2. The Rough Order Magnitude estimate for this Contract is $27 Million This amount includes all construction costs, on-site work (including all required services, parking, and landscaping), site utilities, necessary redundant mechanical systems, communication conduits and wiring, backup power equipment, built-in equipment, built-in furniture, and inflation to achieve substantial completion. This amount excludes HST, design costs, travel and disbursements, consultant fees and expenses, movable equipment and furniture, IT equipment and contingencies DCC will proceed with the Tender Phase around October 19, 2023. The works shall reach substantial completion no later than 810 calendar days following the notification of contract award and shall be completed no later than 90 calendar days after the substantial completion date.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects