Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 24, 2020

January 25, 2021

August 23, 2021

Multiple Locations

Site Work

No Information to Display

$2,646,500.00

Public - City

img_map_placeholder

Multiple Locations, Las Vegas, NV

Subscribe to View Full Documents

**As of 12/1/2020 project was not yet been awarded. No estimated time frame yet. Miscellaneous Pipeline Replacements Phase I The Sites of the Work are located on Atlantic Street (CLV jurisdiction) between St Louis Avenue and Oakey Boulevard, Bourbon Way (CLV jurisdiction) between Torrey Pines Drive and Salem Drive, and Cameron Street (Clark County jurisdiction) between Tropicana Avenue and Quality Court. The Work on Atlantic Street consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,600 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two 2-inch backflow prevention devices, three new fire hydrant assemblies, and all other work as required by the contract documents Question Cutoff Date 11/19/2020 01:00:00 PM (ET) . The Work on Bourbon Way consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,580 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two new fire hydrant assemblies, and all other work as required by the contract documents. The Work on Cameron Street consists of abandoning in place the existing 10-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 2,030 LF of new 10-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. Of the 2,030 LF, approximately 490 LF shall be concrete encased and approximately 90 LF shall be installed trenchless technology. The Work also includes installation of four new fire hydrant assemblies, and all other work as required by the contract documents

63 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects