Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 28, 2020

November 12, 2020

April 15, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$894,935.00

Public - City

img_map_placeholder

Multiple Locations, Reno, NV

Subscribe to View Full Documents

Truckee Meadows Water Authority (Tmwa) is Accepting Sealed Bids for All Labor, Materials, Equipment, and Incidentals Required for Completion of the Trenching, Excavation and Backfill for Water Main and Service Line Replacements. Traffic Control and Temporary Hot-mix Pavement Patching. Grout Filling of Mains to Be Abandoned in-place and Asbestos Cement Pipe Removal. Engineers Estimate: $877,500 - $1,072,500 Tmwa Reserves the Right to Reject Any or All Bids, Including Without Limitation the Right to Reject Any or All Nonconforming, Non-responsive, Unbalanced, or Conditional Bids, and to Reject the Bid of Any Bidder if Tmwa Believes That It Would Not Be in the Best Interest of Tmwa to Make an Award to That Bidder. Tmwa Also Reserves the Right to Waive Informalities. Bids Will Be Evaluated as Prescribed in Nevada Revised Statute 338.147.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.