Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 1, 2021

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Centerville, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of April 7, 2021, this project is in the design phase. An engineer has been selected for the project. Information regarding contractor selection has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Questions associated with this request for qualifications shall be submitted to Pat Turnbull (pturnbull@centervilleohio.gov) in writing by 5:00 p.m. on October 9, 2020. Questions shall be submitted via email only. Bid Amount: None ($0) Performance Amount: None ($0) The City Council and staff committed to a five year Strategic Plan for 2018-2023. Goal Area 1 is focused on the Economic Development in the City, part of which is the Uptown Action Plan. As a part of the City Create the Vision Comprehensive Plan, the Uptown Action plans vision is for Historic Uptown Centerville to be a vibrant district at the heart of our community. Uptown is a welcoming, walkable destination that is home to our history and a friendly gathering place where local businesses thrive. In order to achieve that vision six themes need to be addressed: walkability/traffic reduction; parking; events; business development; branding; greenspace. See Appendix A and B for the Uptown Action Plan and conceptual phasing and images for the plan. The multiphased construction plan over three sections of Uptown is estimated to cost approximately $10 million over a several year period. The intent would be to conduct the preliminary plans for the entire development and the first phase of construction in the next 12 months. The method of contractor selection has not been determined at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects