Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2020

October 26, 2020

June 4, 2021

To Be Determined

Renovation, Site Work

No Information to Display

$1,769,017.00

Public - County

img_map_placeholder

To Be Determined, Milford Township, MN

34

2

24

9

Subscribe to View Full Documents

The project includes the following major quantities of Work: 1. Removal of an existing pump station 2. Construction of a 90,000 gallons per minute pump station with 3 submersible pumps (2 high capacity axial flow and 1 smaller capacity centrifugal flow), a cast in-place structure and a pre-fabricated control building. 3. Removal and installation of 76 linear feet of 84-inch concrete pipe 4. Bid Alternates for the following; a. Mechanical Trash Rake b. Stick Built Control Building c. Forcemain Pipe Material Project is located at: Township: Brighton Township . County: Nicollet State: Minnesota

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects