Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

August 28, 2023

October 8, 2025

SR 3014

Demolition, New Construction, Paving, Site Work

No Information to Display

$4,067,823.00

Public - State/Provincial

img_map_placeholder

SR 3014, Callery, PA

Subscribe to View Full Documents

This Project Includes the Replacement of Two (2) Bridges With Minimal Approach Work and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package. The First Bridge is the Callery Bridge No. 1 on State Route 3014 (Kline Ave.), Section 251, in Butler County Callery Borough From Approximately 500 Feet From Mars Evans City Road Intersection at Segment 0060 Offset 0958 to Approximately 567 Feet From Mars Evans City Road at Segment 0060 Offset 1658. Callery Bridge No. 1 is a Single Span Concrete Arch Bridge That Will Be Replaced With a Single Span Composite Steel Beam Bridge. The Second Bridge is the Callery Bridge No. 2 on State Route 3015 (Mars Evans City Road), Section 255, in Butler County Adams Township Callery Borough From Approximately 200 Feet From the Intersection With Kline Road at Segment 0130 Offset 1468 to Approximately 225 Feet From the Intersection With Kline Road at Segment 0140 Offset 0170. Callery Bridge No. 2 is a Single Span Steel Culvert That Will Be Replaced With a Single Span Precast R.c. Box Culvert. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 31.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement PennDOT - Callery Group Bridges *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

46 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects