Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 2, 2024

October 1, 2025

188 University Gate NW

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

188 University Gate NW, Calgary, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Replacement of refrigerated slabs and the ice plant, and upgrades to meet modern safety and environmental standards. The new plant can be constructed within the existing west annex building allowing for the existing plant space to be reconfigured and used for storage or workshop space. The existing ammonia/ brine system will be replaced with a CO2 plant and a direct CO2 refrigerant piping system. Steel piping is to be used in the new system to accommodate the higher system pressures. The replacement of the Oval slab will include/will provide a new participant tunnel for infield access and a new infield ice melt pit. The new participant tunnel will improve player access to the hockey rinks and separate the public from the high-pressure refrigerant lines in the central service tunnel. The new ice melt pit will allow the ice resurface to remain on the inside of the Oval ice and allow for uninterrupted Oval use. Reconstruction of the slabs is intended to provide an opportunity to move the hockey rinks a further 5 metres apart to increase the infield area. TIMELINE: Design was completed in 2021. The project was cancelled by the owner as funds were reallocated for other required upgrades. This project will not proceed. Coverage of this report is discontinued. *The overall construction budget is estimated at $19 million.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.