Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 28, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Sioux City, IA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Proposals are being requested to perform evaluation, survey, design, permitting, and construction services for the Southbridge Drainage Ditch Project. The proposed project will include reviewing previous drainage studies for the Southbridge Industrial Park and completing the design and survey for a drainage ditch from approximately Andrew Avenue on the east to the Missouri River on the west. This project will include multiple acquisition plats, meetings with adjacent property owners and City Staff, coordinating with multiple State and Federal Government permitting and financing agencies, completing and seeing the project through the design, bid, and construction phases. Consultant services will be funded by the City of Sioux City under CIP Project Number 549-002, Southbridge Drainage Ditch. Construction will be funded with both the City of Sioux City funds and Coronavirus Aid, Relief, and Economic Security (CARES) Act funding. The project budget, including survey, design, inspection and construction is $4,570,000; maximum $4,000,000 in CARES Act funding. Previous drainage studies available upon request to: Brittany Anderson at banderson@sioux-city.org The method of Contractor Selection has not been Determined at this time. As of July 12, 2023, DGR Engineering under contract for design, pending funding this will most likely be a 2025 construction

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.