Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2020

December 30, 2020

January 29, 2021

4 Brush Hill Rd

Renovation

No Information to Display

$196,000.00

Public - City

img_map_placeholder

4 Brush Hill Rd, New Fairfield, CT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

***As of December 9, 2020 project has not been awarded yet. A timeline for award has not yet been established. Town of New Fairfield Department of Public Works is accepting bids for consulting/engineering and construction services in a design-build contract format for the renovation and upgrade of the Town Hall and Annex HVAC system to deal with compliance to recommended COVID-19 requirements. Terms and conditions as well as the description of items are stated in the specifications. The Town of New Fairfield is an equal opportunity and affirmative action purchaser, and bids from all vendors, including those from enterprises owned by minorities and women, are encouraged. Town Hall: Upper Level: a. Provide new ERV Units to supply outside air to the three existing air handlers b. Provide UVGI at Return of each air handling unit. c. Add additional return air ducts as possible to facilitate better air circulation. Lower Level: a. Provide two new Air Handling units. One located at the bottom of the steps and another under the first Selectman's office where the oil tanks are located. Both units would have the largest possible fresh air intake that the unit can sustain. Some enclosure framing work, ceiling work is required and soffits will need to be constructed. b. Provide UVGI at Return of each air handling unit. c. Utilize existing ERV for East Side Floor area. I was surprised to find this unit! d. Provide New ERV for West Side of Floor. Town Hall Annex Building: Upper Level: a. Provide new ERV Units to supply outside air to the three existing air handlers. b. Provide UVGI at Return of each air handling unit. c. Add additional return air ducts as possible to facilitate better air circulation. The scope of this work for this project shall include, but is not limited to, all mechanical, electrical, plumbing, control systems and removal/repair and addition to architectural building elements needed in order to provide for a fully functional systems or fully integrating upgrades to existing HVAC systems that functions with the balance of the existing HVAC system.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects